Services / Granny Flat Designs & Secondary Dwellings

Granny Flat Designs Made for Your Backyard

A granny flat usually starts with a real need. Parents who want to live close by, adult kids who aren't quite ready to move out, a home office with a door that closes, or some extra rental income to help with the mortgage. Whatever the reason, good granny flat designs start with the block, not a brochure. At KBG, we design secondary dwellings around your land, the house that's already on it and the people who'll be living in both. That means giving the granny flat its own privacy, light and outdoor space, while making sure it still sits comfortably next to the main home, from the path to the front door right down to the view from your kitchen window. As an independent building design studio with a 100% current council approval record, we take care of the design, approvals and construction drawings, then you build with whichever licensed builder you choose.

100%
Current council approval record
50+
Years of combined design experience
2
Local studios, Castle Hill & Oatley
Granny flat designs by KBG

Granny Flat Designs for Every Block and Purpose

Most granny flat builders sell a set range of plans and ask you to pick the one that fits best. We work the other way round. We start with your site, then draw a floor plan that suits it and the way it will be used. These are the secondary dwellings we design most often.

Detached granny flat design

Detached Granny Flats

A standalone secondary dwelling in the backyard, placed to keep a comfortable distance from the main house, with its own entry and a private outdoor area.

Attached secondary dwelling design

Attached Secondary Dwellings

Built onto the side or rear of your home, or created within the existing house. A good option when the backyard is tight, or when family needs to be close but still have their own space.

2 bed granny flat floor plan

One and Two Bedroom Floor Plans

From a compact one bedroom layout to a 2 bed granny flat floor plan for a couple or small family, planned to get the most out of every square metre you're allowed.

Granny flat on a sloping block

Granny Flats on Tricky Blocks

Sloping, narrow, corner and irregular blocks, where a standard kit plan won't sit comfortably and a custom built granny flat design makes the real difference.

Garage to granny flat conversion

Converting an Existing Space

Turning a garage or part of your home into a self-contained secondary dwelling can mean less building work than starting from scratch, but it comes with its own compliance challenges. We can review your existing space and give you upfront advice on whether it's a suitable option. See our renovation design and house extensions service for more.

Granny Flat Designs Shaped Around Your Block and Your Family

Every granny flat plan we draw starts with your site's shape, slope and orientation, not a fixed range. Most secondary dwellings in NSW are limited to 60 square metres, so we plan storage, circulation and living space carefully to make sure the finished home never feels cramped. We also place windows, entries and outdoor areas so the main house and the granny flat each keep their own privacy.

Before any detailed design starts, we check whether your granny flat can go through the faster Complying Development pathway, and we design to those standards when it can. Where a site needs extra care, our related engineering practice, KB Consulting, can handle structural design and stormwater. Because we don't build, your plans are ready to go to any licensed builder or granny flat specialist for quoting.

Why Choose KBG

  • 100% current council approval record
  • Designing Sydney homes since 1983
  • Faster approval pathway checked first
  • Structural and stormwater engineering support
  • Independent studio, build with any licensed builder
  • 5.0-star rating on Google
Secondary dwelling requirements NSW

Secondary Dwelling Requirements in NSW

In NSW, secondary dwellings are covered by the State Environmental Planning Policy (Housing) 2021, usually called the Housing SEPP, along with your own council's planning controls. The rules can look confusing at first, but a few basics apply to most residential blocks.

The basics at a glance

Up to 60 Square Metres

A secondary dwelling can generally have up to 60 square metres of floor area. Some councils allow more under their Local Environmental Plan (LEP), usually worked out as a percentage of the existing home's floor area.

One House, One Granny Flat

Only one main house and one secondary dwelling are allowed on the lot, and the lot can't be subdivided, so the granny flat can't be sold separately.

The Faster CDC Pathway

To use the faster Complying Development pathway, the lot generally needs to be at least 450 square metres, and the design has to meet set standards for things like setbacks, height and site coverage.

When a DA Is Needed

Blocks affected by heritage, flooding or bushfire controls, or designs that can't meet the Complying Development standards, will usually need a Development Application to council.

No Extra Parking Required

The Housing SEPP doesn't require an extra parking space for a secondary dwelling.

What's Included in Your Granny Flat Design

Whether it's a detached granny flat down the back of the yard or a secondary dwelling attached to your home, here's what we take care of:

Site and Services Review

A site review covering your block's size, slope, access and existing services, including where sewer and stormwater lines run.

Existing Home Measure

A measure-up of the existing home to confirm its gross floor area, which can affect how large your granny flat is allowed to be.

Planning Pathway Check

A planning check to confirm whether your granny flat can be approved as Complying Development or needs a Development Application.

Concept Design and 3D

Concept design and 3D visualisation, so you can see how the granny flat sits alongside the main house before anything is finalised.

Floor Plans and Elevations

Detailed floor plans and elevations, refined with you until the layout works for the people who'll live there.

Full DA or CDC Documentation

Full DA or CDC documentation, prepared and lodged with council or your certifier.

CC and Building Plans

CC documentation for construction approval, plus granny flat building plans ready for your chosen builder to quote and build from.

Engineering Coordination

Coordination with KB Consulting for structural or civil engineering, where your site needs it.

Granny Flats Across Sydney

We design granny flats and secondary dwellings across Castle Hill, Baulkham Hills, Kellyville, Cherrybrook, Beecroft and the wider Hills District, as well as Parramatta, Epping and Hornsby, from our Castle Hill studio. From our Oatley studio, we work across Oatley, Sutherland, Cronulla, Miranda, Engadine, Bayside and the Georges River area.

Plenty of homes in these suburbs sit on good sized blocks with room at the back, which makes a granny flat one of the most practical ways to add space for family or create a rental. What's possible still depends on the block, though. Bushfire zones, protected trees, sewer mains and flood affected land can all change where a granny flat can go and how it's approved. Because we deal regularly with Hills Shire, Parramatta, Hornsby and Ku-ring-gai councils in the north west, and Sutherland Shire, Bayside and Georges River councils in the south, we know what each of them looks for and design around it from the first sketch. Visit us at either studio, or we'll come out and walk the backyard with you.

BOTANY BAY TASMAN SEA Kellyville Hornsby Cherrybrook Norwest Baulkham Hills Epping Parramatta Castle Hill KBG studio Sydney CBD Oatley KBG studio Bayside Georges River Sutherland Miranda Cronulla Engadine

FAQs

How big can a granny flat be in NSW?+

Under the Housing SEPP, a secondary dwelling can generally have up to 60 square metres of floor area. Some councils allow a larger granny flat under their Local Environmental Plan (LEP), usually worked out as a percentage of the existing home's floor area. That's why we measure up your existing home at the start, so we know exactly how much space you're allowed. The granny flat also has to fit within the overall limits for your block, such as setbacks and site coverage, and on a smaller lot these can matter just as much as the floor area figure. We check all of this before we start designing.

Do you need a DA for a granny flat in NSW?+

Not always. If your block and design meet the Complying Development standards, a certifier can approve your granny flat through a Complying Development Certificate (CDC), which can be issued in as little as 20 days once a complete application is lodged. In general, the lot needs to be at least 450 square metres and the design has to meet set rules for setbacks, height and site coverage. If your block is smaller, is in a heritage area or is affected by flooding or bushfire, or the design can't meet those standards, it will need a Development Application (DA) through council. We confirm the right pathway at the start of the project.

How much does a granny flat cost in Sydney?+

It depends on the size of the granny flat, whether it's detached or attached, how easy your site is to build on, and the finishes you choose. Things like a sloping block, limited access to the backyard or a long run to the sewer connection can all add to the build cost. Because KBG designs your granny flat rather than builds it, construction costs come from your builder. What we can do is give you a clear idea of our design fees once we understand your project, and point out anything on your site likely to affect the build, so you can set a realistic budget from the start.

Can I rent out a granny flat in NSW?+

Yes. In NSW you can rent a secondary dwelling to anyone, not just family members, once it's been built and an occupation certificate has been issued. Normal residential tenancy laws apply, just as they would for any rental property. It's also a good idea to talk to your accountant before renting it out, as rental income can affect your tax and capital gains position.

How long does it take to build a granny flat?+

It depends on the pathway and the builder, but it helps to think of it in three stages: design, approval and construction. Design time depends on how complex your site is and how many changes you'd like along the way. For approval, a CDC can be issued by a certifier in as little as 20 days once a complete application is lodged, while a DA through council takes longer, often a few months. Construction is set by your builder, and depends on the size of the granny flat, your site and the time of year. Because KBG designs your granny flat rather than builds it, we can't set the build timeframe, but we'll give you a realistic picture of the design and approval stages at your first consultation, and your plans will be ready for builders to quote and schedule as soon as approval comes through.

How It Works

From first conversation to construction.

01

Free Consultation

We sit down with you, or speak by phone, to understand your project, site, budget and vision. No jargon, no pressure, just honest advice.

02

Feasibility & Brief

We review your block against council planning controls and give you a clear feasibility summary, what's achievable, the best pathway and likely timeframes.

03

Concept Design

Our designers produce initial concepts, including 3D visualisations, for your feedback. We refine until the design truly reflects your vision.

04

DA / CDC Submission

We prepare your full Development Application or CDC and manage submission to council or your certifier, accurately, completely, first time.

05

Construction Drawings

Once approved, we produce the detailed construction documentation your builder needs, coordinated with engineering via KB Consulting where required.

Get Started

Book a free, no-obligation consultation.

We'll assess your site, discuss your options and give you honest advice, with no hidden fees.